Equipment
Negative

Transocean Arctic


What happened in P&A:
Neck on lower part of MPT too short for making up MPT to DP with IRN when using 13 3/8″ adapter for wearbushing. Had to remove adapter to be able to use IRN for MU. Adapter installed again after MU.

What Was Planned

Pull wellhead

What Was Learned

Need a longer neck/sub on lower part of MPT.

What Actions Are Required

Include in planning phase.